dfi-led-matrix/eigener_ctrl/stm32f407-olimex/chibios/test/rt/testbuild/readme.txt

29 lines
933 B
Plaintext
Executable File

This test performs 5 distinct operations on the RT code base. Each phase
writes a log file where errors can be found if the execution stops.
Step 1: Build
This step makes sure that there aren't compilation errors nor warnings in all
the defined configurations.
Step 2: Execute
The test suite is executed in the simulator in order to make sure that all
the defined test cases succeed in all the defined configurations.
Coverage data is collected during the execution for use by step 3.
Step 3: Coverage
The utility gcov is ran on the generate data and the coverage information is
stored in reports under ./reports.
Step 4: Analysis
PC-Lint is run on the codebase in order to detect MISRA violations or other
problems under the current analyser rules set (PC-Lint 9.0L is required).
Step 5: Clearing
The compilation products are cleared and the system is restored to original
state except for the generated reports and logs.